• Have an electrician verify proper input/output/load/grounding
  • IF APPLICABLE, schedule (and actually conduct) building power failover tests to both UPS battery and generator
  • Have a site power analysis that checks for the soundness of the wiring, the quality of the AC voltage, and source of any power disturbances